Data record std.tia-607-e.method.two-point-criterion
Verified 2026-10-25 Confidence: High
Clause 9.1 of ANSI/TIA-607-E (2024) recommends an upper limit on the resistance measured from any point in the telecommunications bonding system to the building's grounding electrode system, and requires the resistance of long backbone conductors to be included in the total without saying how.
| Step | Item | Detail |
|---|---|---|
| Source | ANSI/TIA-607-E | Licensed standard, clause 9.1 |
| Data record | std.tia-607-e.method.two-point-criterion | Verified 2026-10-25 |
| Entry | ANSI/TIA-607-E | No revisions |
- Subject
- ANSI/TIA-607-E (Standards)
- Kind
- Method fact
- Source
- ANSI/TIA-607-E, 2024 edition, clause 9.1, page 53, Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises, TIA.
History
| Date | Change |
|---|---|
| 2026-10-25 | created |
| 2026-10-25 | revised |
| 2026-10-25 | review_status unreviewed -> software_reviewed |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Data record std.tia-607-e.method.two-point-criterion." Grounding Reference. 2026-10-25. https://www.groundingreference.com/data/std.tia-607-e.method.two-point-criterion/.
Grounding Reference, Data record std.tia-607-e.method.two-point-criterion (Oct. 25, 2026), https://www.groundingreference.com/data/std.tia-607-e.method.two-point-criterion/.
@misc{etr-data-std-tia-607-e-method-two-point-criterion,
title = {Data record std.tia-607-e.method.two-point-criterion},
howpublished = {\url{https://www.groundingreference.com/data/std.tia-607-e.method.two-point-criterion/}},
organization = {Grounding Reference},
publisher = {Grounding Reference},
year = {2026},
note = {last substantive change 2026-10-25}
}{{cite web |title=Data record std.tia-607-e.method.two-point-criterion |website=Grounding Reference |publisher=Grounding Reference |url=https://www.groundingreference.com/data/std.tia-607-e.method.two-point-criterion/ |date=2026-10-25 |access-date=}}